GNC alfa


A BMS system was installed at the "VM ware" data center in Yerevan to monitor the critical facilities in the building.

Project developed in EcoStruxure Building Operation 2022 (4.0) and based on the new automation server AS-B.
A 3D model of the entire building was created and an individual user interface design was implemented.
The important parameters are archived, graphs are provided.
And an email notification system is also implemented. BMS notifies responsible employees in a timely manner of all incidents in the building.
An aspiration sensor is installed in the server room.
A shield was also assembled and installed in which the AS-B server is located.