Dvin Hotel Yerevan


For the hotel complex "The Dvin" a building management system was developed.

 

BMS

The project was developed in EcoStruxure Building Operation version 1.8, then the whole system was updated to version EcoStruxure Building Operation 2023 (5.0). The Enterprise server manages several automation servers AS- P and AS-B, which are responsible for different segments of the building.

 

GRMS

Developed and implemented a hotel management management system numbers (GRMS) based on controllers HRC . Individual visualization and the ability to manage both each hotel room separately and send parameters for a group of rooms have been developed.
The hotel complex uses touch panels to control lighting, heating, ventilation and curtains.
For hotel rooms, the calculation and analysis of occupancy and the number of rooms sold are implemented, as well as displaying statistics in a separate window.

An interface has been implemented that allows you to divide the building into 2 parts: north and south. This feature allows you to set different parameters for maintaining the temperature in the rooms, depending on the belonging to the side of the building.

An automation and control panel has been developed and installed in each room.

 

HVAC&R

The building management system of the hotel complex includes the management of all climate control units in the building (AHU). At the moment, monitoring and management of the 15th AHU has been implemented. For this project, automation and control panels were developed and assembled. Each unit is controlled by controllers Modicon M172.

The hotel complex has a fully automated boiler room and two individual heat points.
A pump redundancy system has been implemented: if the main pump fails, the system will automatically turn on the backup pump, notifying the operator about the malfunction.
Statistics are also kept on the number of hours of operation of all pumps.

A chiller heat recovery system has been implemented to reduce energy consumption and costs by using the waste heat generated during the cooling process to provide hot water to the hotel room stock.

 

Lighting

The hotel complex "The Dvin" implemented a lighting control system throughout the building. In particular, using the BACnet gateway SpaceLynk Implemented control of lamps with Dali interface in the ballroom of the hotel complex.

 

Integrations with other systems

Implemented integration with Opera hotel room booking system.
Implemented integration with the Hoteza system.